2011 IEEE/RSJ International Conference on Intelligent Robots and Systems · 2011 · 14 citations · 13 references
EngineeringComputer ScienceRobotics EngineeringDistributed SystemsMulti-robot SystemsRoboticsConstraint SatisfactionConstraint-based SchedulingConstruction RoboticsDecentralized PlanningOptimization In MechanicsTask AllocationAdaptive AlgorithmsAdaptive Control AlgorithmsConstraintsGeometric TessellationOptimization Of Truss StructuresPart PlacementPhysical Design ConstraintsTruss Systems
This paper presents a constraint-aware decentralized approach to construction with teams of robots. We present an extension to existing work on a distributed controller for robotic construction of simple structures. Our previous work described a set of adaptive algorithms for constructing truss structures given a target geometry using continuous and graph-based equal-mass partitioning [1], [2]. Using this work as a foundation, we present an algorithm which performs construction tasks and conforms to physical constraints while considering those constraints to parallelize tasks. This is accomplished by defining a mass function which reflects the priority of part placement and prevents physically impossible states. This mass function generates a set of pointmasses in ℝ <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">n</sup> , and we present a novel algorithm for finding a locally optimal, equal-mass, convex tessellation of such a set.
13