CIRP journal of manufacturing science and technology · 2018 · 133 citations · 27 references
EngineeringAutomotive EngineeringManufacturing EngineeringAutomotive ManufacturingHuman-robot InteractionProduction PlanningAssemblyAssembly SystemsDesign For AssemblyHuman-robot CollaborationHuman-robot TeamingTask AllocationAssembly Cell LayoutAssembly PlanningHuman-robot AssemblyHuman-robot Collaboration In AssemblyHuman-robot Collaboration PlanningRobot Assembly PlanningTask AssignmentTask Planning For Assembly
A multi criteria method, in support of the planning of shared human robot assembly tasks is presented in this paper. CAD models are used for the extraction of a product's assembly sequence, whilst an algorithm is applied for the generation and examination of alternative assignment scenarios. The design algorithm performs the joint planning of task-to-resource assignment and cell layout at the same time. The evaluation of each planning scenario against a set of ergonomics, quality and productivity criteria is made for the identification of the most efficient ones. The method's implementation, in the form of a prototype planning tool (Task Planner), enables its application to a pilot case from the automotive industry. The results indicate that the method can provide high quality solutions with respect to the end users' criteria and has potential applicability as a decision making support tool in the planning stage.
27
Assembly system design and operations for product variety
Shaolong Hu, Jeonghan Ko, Lars Weyand et al. · CIRP Annals · 2011 · 510 citations
Engineering, Industrial Engineering, Manufacturing Engineering +14
Design Considerations for Safe Human-robot Collaborative Workplaces
George Michalos, Sotiris Makris, Panagiota Tsarouchi et al. · Procedia CIRP · 2015 · 307 citations · Full text