VR-PMS: a new approach for performance measurement and management of industrial systems

François Vernadat, Lalit Shah, Alain Etienne, A. Siadat

International Journal of Production Research · 2013 · 50 citations · 36 references

DOIFull text

Open access

Concepts

TL;DR

The authors propose a value‑ and risk‑based performance measurement and management framework for evaluating and selecting manufacturing process alternatives. The framework combines a conceptual value‑risk model with a four‑phase process—context establishment, performance modelling, assessment, and decision‑making—instrumented by quantitative analysis tools. Applying the VR‑PMS yields ranked alternative processes evaluated by value and risk indicators, as demonstrated in a discrete‑parts manufacturing case study and shown to be broadly applicable.

Abstract

A new performance measurement and management framework based on value and risk is proposed. The proposed framework is applied to the modelling and evaluation of the a priori performance evaluation of manufacturing processes and to deciding on their alternatives. For this reason, it consistently integrates concepts relevant to objectives, activity, and risk in a single framework comprising a conceptual value/risk model, and it conceptualises the idea of value- and risk-based performance management in a process context. In addition, a methodological framework is developed to provide guidelines for the decision-makers or performance evaluators of the processes. To facilitate the performance measurement and management process, this latter framework is organised in four phases: context establishment, performance modelling, performance assessment, and decision-making. Each phase of the framework is then instrumented with state-of-the-art quantitative analysis tools and methods. For process design and evaluation, the deliverable of the value- and risk-based performance measurement and management system (VR-PMS) is a set of ranked solutions (i.e. alternative business processes) evaluated against the developed value and risk indicators. The proposed VR-PMS is illustrated with a case study from discrete parts manufacturing but is indeed applicable to a wide range of processes or systems.

References

36