International Journal of Quality & Reliability Management · 2009 · 123 citations · 38 references
EngineeringOperations ManagementOrganizational DesignSystems AnalysisSystems DesignProcess ArchitectureProcess IntegrationSystem ImplementationSystems IntegrationIntegrated Management SystemsIntegration ManagementOperational Excellence MeasurementOperational Excellence MetricsSystematic Literature ReviewSystems Of Systems Integration
The paper presents a process‑based design framework for implementing integrated management systems, offering a practical recipe for practitioners, regulators, and researchers. The authors surveyed peer‑reviewed literature to develop a comprehensive methodology that designs core activities from stakeholder needs, applies operational excellence tools to eliminate waste, integrates the refined processes into existing management systems, and embeds institutionalization through training. The study shows that context‑ and process‑based design is essential for successful IMS implementation, and offers a practical strategy for implementation and institutionalization.
Purpose The purpose of this paper is to provide a process‐based design of integrated management systems (IMS) implementation. Design/methodology/approach An extensive survey of peer‐reviewed literature was conducted. Based on the literature review, a comprehensive methodology for the design and implementation of an IMS was developed. Findings A critical review of the strategies employed and of difficulties encountered in IMS implementation reveals the need for a context‐ and process‐based design of IMS. At the operational level core activities are first designed from the perspective of stakeholders' requirements and then treated with operational excellence tools to strip away waste. The transformed core processes are then integrated with mainstream individual management systems to form one composite and holistic management system. The institutionalisation of IMS needs to be addressed in its design (through process embedded design) as well as at the users' level (through education and training of employees). Practical implications The paper provides the process‐based strategy for IMS implementation and institutionalisation. Originality/value The paper should be useful for practitioners searching for a recipe to integrate management systems, for government regulatory agencies seeking to facilitate the integration of management systems, and for researchers as a future area of research.
38