International Journal of Construction Supply Chain Management · 2019 · 18 citations · 30 references
ArchitectureConstruction ManagementInformation TechnologyConstruction Operations ManagementConstruction Project ManagementConstruction TechnologyCommunication BarriersTime-impact AnalysisConstruction Cost Overrun ModelingQualitative InterviewingTime Overrun Analysis
Cost and time overruns are major issues faced by the construction industry worldwide. Studies have shown that various factors cause these overruns. One of the critical factors that cause these overruns is poor communication. This study aims to study and measure the severity of poor communication in causingcost and time overruns in construction projects. The study adopted two consecutive approaches to study the effect of poor communication in causingcost and time overruns. The first approach was to conduct an extensive literature review to extract causative factors from diverse construction industries that consider poor communication as a causative factor,then to determineits severity percentage,among other factors for each study. From the analysis, it can be concluded that developed countries that apply information communication technology and advanced communication systems have lowerseverity percentages compared to other countries. The second approach was to conduct a qualitative study by interviewing construction experts and to examine their commentsand criticisms ofthe results obtained from the literature. Experts were asked to highlight their views on the severity of poor communication in the construction industry. The outcome of these interviews was thematically analysed. The findings show that poor communication has a significanteffect on cost and time overruns in construction projects.
30
Yaw Frimpong, Jacob Oluwoye, Lynn Crawford · International Journal of Project Management · 2003 · 796 citations
Management, Construction Management, Water Resources Management +14