Why Would Location-Based Scheduling Be Applicable for Offshore Wind Turbine Construction?

Jon Lerche, Olli Seppänen, Kristian Birch Pedersen, Hasse H. Neve, Søren Wandahl, Allan E. Gross

Annual Conference of the International Group for Lean Construction · 2019 · 11 citations · 21 references

DOIFull text

Open access

Concepts

Abstract

The focus in this research was the conversion of a traditional activity-based construction schedule to a location-based schedule. The case investigated was an offshore wind turbine project in the British sector of the North Sea. This exploratory case study used a deductive approach studying the literature. The initial step was a review of the location-based scheduling literature. The applicability of the theory could be tested through understanding the patterns from existing location-based scheduling literature. These patterns were the adapted from the construction context to the offshore wind construction context. With the knowledge of how and why from a theoretical perspective, the authors analyzed the existing construction schedule which was based on the critical path methodology. The results from this analysis provided knowledge about how location-based scheduling is applicable from an industrial perspective. This research contributes knowledge by testing the theory of location-based scheduling in the context of offshore wind turbine construction industry.

References

21