Abstract

What are the differences between production system design and work structuring? And between phase scheduling and work structuring? Which lean planning tool is better suited for each one of these design processes: line of balance, takt-time planning or flowline? This paper aims to answer these questions through a comparison and deeper understanding of production design processes, as well as the potential uses of location-based tools for production planning and control in each design effort.

References

15