EVALUATION OF RISK FACTORS AFFECTING TIME AND COST OF CONSTRUCTION PROJECTS IN YEMEN

Saleh Alawi Ahmad, Usama Hamed Issa, Moataz Awad M. Farag, Laila M. Abdelhafez

2013 · 19 citations · 10 references

Concepts

Abstract

Construction projects in Yemen, like other developing countries, are dramatically experiencing a highly risk prone, due to their complex and dynamic environments. Thus, such nature is creating an atmosphere of high uncertainty and risks. This consequently leads to both project time and cost overruns. In this paper, a study is carried out to identify and assess the critical risk factors that are influencing time and cost of construction projects in Yemen. Through a comprehensive review for related literatures, 54 common risk factors are identified and categorized into ten groups. The study is further guided by interview sessions as well as a questionnaire survey to professionals and practitioners of construction projects in Yemen, in order to collect the required data. Analyzing the data is statistically accomplished using SPSS software. Results show a significant frequency of time and cost overruns of construction projects in Yemen. Delay in delivery of materials to site and Political instability are located at the top-ranked risk factors that cause projects delay. While, on the other side, the risk factors of Increase of Inflation rates and Fluctuations in the material's prices have the most significant impact on project's budget. However, the research introduces some risk factors, which have the same degree of impact on both time and cost. Moreover, results demonstrate that 47 % of the total projects faced time overrun while 40 % of the total projects faced cost overrun in Yemen.

References

10