IEEE Transactions on Power Systems · 2013 · 49 citations · 21 references
ManagementRegulatory PolicyRisk ManagementIncentive SystemsRegulatory DesignReward SystemsDistribution Network PlanningElectricity RegulationIncentive CompensationIncentive SchemesPenalty DesignPower System ReliabilityDistribution Network RegulationDistribution ReliabilityDistribution System RegulationDistribution System ReliabilityElectric Distribution PolicyElectricity DistributionPenalty MechanismsReliability Cost Analysis
Performance-based regulations accompanied by quality regulations are gaining ground in the electricity distribution business. Several European countries apply quality regulations with reward and penalty schemes (RPSs), where the distribution system operator (DSO) is rewarded (or penalized) when fulfilling (or not fulfilling) an adequate level of reliability to its customers. This paper develops a method that the regulator can use before enforcing a regulation to get an understanding of the impact different RPS design solutions have on the DSO's financial risk and incentives to invest in reliability. The proposed method also includes a sensitivity analysis to identify which are the most important parameters in an RPS. The new method is applied to three regulatory challenges to evaluate their RPS design solutions. Results show that the choice of scheme design and cost model used to decide the incentive rate have a large impact on the DSO's financial risk and incentive to invest.
21
Customer cost of electric service interruptions
G. Wacker, R. Billinton · Proceedings of the IEEE · 1989 · 216 citations
Regulating Service Quality: A Survey
David E. M. Sappington · Journal of Regulatory Economics · 2005 · 191 citations
Economic costs of electricity supply interruptions
Arun P. Sanghvi · Energy Economics · 1982 · 127 citations