IEEE Transactions on Computers · 1989 · 14 citations · 0 references
EngineeringComputer EngineeringComputer ScienceComputer ArchitectureMicroelectronicsSchedulingDelay ModelingDesign SimulationHardware Modeling For Digital SystemsTiming AnalysisTiming ModelingTiming SemanticsBehavioral SimulationCircuit Delay ModelingGate Delay ModelingInertial DelayPreemptive Scheduling ModelPreemptive Scheduling PoliciesPropagation Delay Modeling
The authors examine the limitations of the timing semantics in the conventional behavioral simulators and present a preemptive scheduling mechanism for accurate behavioral simulation results. They consider two signal transitions at the input ports of a component, where the second input transition arrives later than the first transition. The first and second input transitions cause first output signal transitions O/sub 1/ and O/sub 2/, respectively, to be generated at the output port of the component. When the logical values of O/sub 1/ and O/sub 2/ conflict with each other and O/sub 1/ arrives later than O/sub 2/, O/sub 1/ is preempted by O/sub 2/. In addition, an input signal to a component whose pulse duration is smaller than the inertial delay of the component, T/sub mip/, is discarded during simulation. Empirical measures for T/sub mip/ relative to the high-to-low and low-to-high propagation delays of the component for TL (transistor-transistor logic), NMOS, and CMOS technologies are presented. This approach has been implemented in the ADLIB-SABLE simulator at Stanford University.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>