Estimation of the Change Point in Monitoring the Process Mean and Variance

Jaeheon Lee, Changsoon Park

Communications in Statistics - Simulation and Computation · 2007 · 12 citations · 7 references

Concepts

Abstract

Abstract Knowing the time of a process change could lead to quicker identification of the special cause and less process down time, as well as help to reduce the probability of incorrectly identifying the special cause. In this article, we propose the maximum likelihood estimator (MLE) for the process change point when a control chart with the fixed sampling rate (FSR) scheme or the variable sampling rate (VSR) scheme is used in monitoring a process to detect changes in the process mean and/or variance of a normal quality variable. We investigate the performance of this estimator when it is used in various types of control charts. Keywords: Control chartMaximum likelihood estimatorProcess change pointVariable sample sizeVariable sampling intervalVariable sampling rateMathematics Subject Classification: Primary 62P30Secondary 62F10

References

7