2015 · 91 citations · 10 references
EngineeringCivil EngineeringConstruction ManagementComputer VisionConstruction EngineeringConstruction Project ManagementBim VisualizationConstruction AutomationConstruction PlanningPhotogrammetryProgress MeasurementScene Reconstruction4D ModelingAutomated Progress MonitoringConstructionConstruction Progress MeasurementConstruction Progress TrackingImage-based MonitoringModel-driven Progress TrackingProgress Monitoring
Automated assessment of work-in-progress using large collections of site images and 4D BIM has potential to significantly improve the efficiency of construction project controls. Nevertheless, today’s manual procedures for taking site photos do not support the desired frequency or completeness for automated progress monitoring. While the usage of Unmanned Aerial Vehicles for acquisition of site images has gained popularity, their application for addressing issues associated with image-based progress monitoring and particularly leveraging 4D BIM for steering the data collection process has not been investigated before. By presenting examples from two case studies conducted on real-world construction projects, this paper suggests a framework for model-driven acquisition and analytics of progress images. In particular, the potential of spatial (geometry, appearance, and interconnectivity) and temporal information in 4D BIM for autonomous data acquisition and analytics that guarantees completeness and accuracy for both as-built modeling and monitoring work-in-progress at the schedule task-level is discussed.
10
Towards Linear-Time Incremental Structure from Motion
Changchang Wu · 2013 · 1.3K citations
Journal of Construction Engineering and Management
Jesus de la Garza, Charles T. Jahren, Edward J. Jaselskis et al. · 1983 · 983 citations
Architecture, Construction Management, Project Management +17
Finding paths through the world's photos
Noah Snavely, Rahul Garg, Steven M. Seitz et al. · ACM Transactions on Graphics · 2008 · 207 citations