Publication | Open Access
Grouping Preventive Maintenance Strategy of Flexible Manufacturing Systems and Its Optimization Based on Reliability and Cost
14
Citations
14
References
2023
Year
EngineeringFlexible Manufacturing TechnologyIndustrial EngineeringMechanical EngineeringFlexible Manufacturing SystemsSystem ReliabilityMaintenance SchedulingOptimal System DesignOperations ResearchReliability EngineeringSupportability EngineeringMaintenance PolicySystems EngineeringLogisticsReliabilityDesignFlexible ManufacturingManufacturing SystemsSupply Chain ManagementFlexible Manufacturing SystemPreventive Maintenance StrategyIndustrial DesignReliability Management Systems DesignReliability ModellingReliability ManagementBusinessElement GroupingMaintenance ManagementReliability Levels
A flexible manufacturing system (FMS) improves productivity and makes it more efficient. Maintaining reliability levels and reducing costs through proper maintenance strategies are key problems for the development and application of a FMS. This paper proposes a grouping preventive maintenance strategy of a FMS with optimized parameters by considering both reliability and cost. In this work, a three-layer evaluation index system is first presented to accurately estimate the reliability of the FMS; index weights of each layer were obtained by reliability importance modeling and analysis, considering maintenance strategies. An element-grouping preventive strategy is proposed based on an influencing analysis, and a parameter optimization problem (considering reliability and maintenance costs) was established. In this strategy, three maintenance methods are presented for the elements, including low-level maintenance with a large period, low-level maintenance with a small period, as well as the combination of low-level maintenance with a small period and high-level maintenance with a large period; the effects of reliability improvement of the elements on the subsystem’s reliability were analyzed to provide evidence for element grouping. Finally, the proposed method was applied to a box-part finishing FMS; the results indicate that this method can effectively reduce maintenance costs on the premise of satisfying the reliability requirements.
| Year | Citations | |
|---|---|---|
Page 1
Page 1