Journal of Computing in Civil Engineering · 2021 · 38 citations · 49 references
ArchitectureComputer ScienceConstruction ManagementComputer VisionConstruction EngineeringConstruction SchedulingConstruction AutomationConstruction PlanningDelay AnalysisComputer Vision For ConstructionConstructionConstruction Schedule OptimizationDetectionDisruption ManagementDisruptionsRepair Cost AnalysisSchedule Impact Analysis
Prefabricated building construction (PBC) projects are prone to schedule delays and budget overruns due to disruptions. Hence it is necessary to timely detect and evaluate disruptions and respond in order to put a disrupted construction project back on track. This study focused on computer vision–based (CVB) disruption management for PBC schedules. First, real-time and nonintrusive detection of four types of disruptions on PBC jobsite was achieved using CVB technology. Second, the detected disruptions of the PBC schedule were evaluated by quantifying their impacts on the project. Third, repair of the disrupted schedule was achieved based on the principle of disruption management by developing an optimization model with the objectives of minimizing the repair cost and deviation from the original schedule. The proposed disruption management system was illustrated and justified through a field application. This study is expected to provide a digital methodology to achieve digital disruption management for the PBC schedule.
49
Deep Residual Learning for Image Recognition
Kaiming He, Xiangyu Zhang, Shaoqing Ren et al. · 2016 · 222.1K citations · Full text
MOT16: A Benchmark for Multi-Object Tracking
Anton Milan, Laura Leal-Taixé, Ian Reid et al. · arXiv (Cornell University) · 2016 · 1.4K citations · Full text
Detecting non-hardhat-use by a deep learning method from far-field surveillance videos
Fang Qi, Heng Li, Xiaochun Luo et al. · Automation in Construction · 2017 · 536 citations