2019 8th International Conference on Modern Power Systems (MPS) · 2019 · 11 citations · 3 references
ManagementProject ManagementCost-benefit AnalysisDemand ForecastingPerformance MeasurementDemand ManagementPerformance EvaluationPerformance MeasuresProject Performance MeasurementKey Performance IndicatorsPilot Project Deployment
The concept of Demand Response (DR) is not really widespread across Romania, so the Technical University of Cluj-Napoca (TUCN) implemented a pilot project in its own buildings within the Horizon 2020, named DR-BOB (project no. 696114/2016). Within this project, the Romanian demonstration site implemented different DR events throughout the whole evaluation period. The Key Performance Indicators (KPIs) are calculated for each DR event and on the entire evaluation year. This paper reflects the evaluation of the pilot sites, focusing on description of calculation method of the KPIs and the results obtained at the Swimming Pool Complex. The KPIs are calculated in accordance with the methodology defined in [6].
3
Clustering methods in data fragmentation 1
Adrian Sergiu Dărăbant, Laura Darabant · 2011 · 15 citations
Energy Management System for the Demand Response in TUCN Buildings
Bogdan Bârgăuan, Mihaela Crețu, Ovidiu Fati et al. · 2018 · 14 citations
Demand response on blocks of buildings — Romanian pilot site innovation project
Bogdan Bârgăuan, Ovidiu Fati, Andrei Ceclan et al. · 2017 · 12 citations