Procedia CIRP · 2018 · 20 citations · 18 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProject SchedulingSchedulingAssignment ProblemsResource-constrained SchedulingSchedule OptimizationScheduling OptimizationScheduling TheoryTask SchedulingAssembly PlanningAssembly Process OptimizationAssembly Process PlanningOperator AssignmentOperator StaffingResource-constrained Project SchedulingSchedule PlanningTask Planning For Assembly
The assembly process is extremely complex for aircraft and its management requires to address numerous optimization problems related to the assignment of tasks to workstations, staffing problem for each workstation and finally the assignment of tasks to operators at each workstation. This paper treats the latter problem dealing with the assignment of tasks to operators under ergonomic constraints. The problem of optimal tasks scheduling in aircraft assembly line is modelled as Resource-Constrained Project Scheduling Problem (RCPSP). The objective of this research is to assign tasks to operators and to find an optimal schedule of task processing under economic and ergonomic constraints. Two different models to solve this problem are presented and evaluated on an industrial case study.
18
Rapid Entire Body Assessment (REBA)
Sue Hignett, Lynn McAtamney · Applied Ergonomics · 2000 · 2.2K citations
Revised NIOSH equation for the design and evaluation of manual lifting tasks
Thomas Waters, Vern Putz‐Anderson, Arun Garg et al. · Ergonomics · 1993 · 2K citations