Annual Conference of the International Group for Lean Construction · 2018 · 11 citations · 24 references
ManagementConstruction ManagementOperations ManagementConstruction Operations ManagementConstruction Project ManagementProduction PlanningSlack AnalysisStandard WorkStandardized WorkConstructionContinuous Improvement AnalysisProduction System DesignSlack MetricsSlack OptimizationToyota Production System
Standardized work (SW) is a type of action-oriented procedure that sets a basis for continuous improvement in the Toyota Production System. However, the usefulness and applicability of this practice to construction is still unclear. Furthermore, while some studies have addressed the key elements of SW, the role played by the concept of slack as a fundamental element of operations design is rarely discussed in an explicit way. This is a drawback since slack resources allow for the system to cope with variability from different sources.
24
Risk management in a dynamic society: a modelling problem
Jens Rasmussen · Safety Science · 1997 · 2.9K citations
Decoding the DNA of the Toyota Production System
Steven J. Spear, H. Kent Bowen · Harvard business review · 1999 · 1.3K citations