Industrial application of a model predictive control solution for power plant startups

Fernando D’Amato

2006 · 21 citations · 5 references

Concepts

Abstract

This paper reports on the development and a successful MPC implementation for startups of combined-cycle plants. Minimizing startup times is important for energy utility companies to reduce operating costs due to lower fuel consumption and lower emissions. The new controller regulates the gas turbine loads while keeping the main operating constraints (steam turbine stresses) within their allowable ranges.

References

5