GeoCongress 2006 · 2006 · 17 citations · 1 references
EngineeringCivil EngineeringSoil SciencesGeotechnical EngineeringGround ImprovementTunnel EngineeringFrozen Ground ProcessesGround FreezingTunnel InstrumentationTunnel MonitoringTunnel SafetyTunnelingArtificial Ground FreezingAutomatic Data LoggingGround ThawingMonitoring Of Ground FreezingSoil Water Retention ImprovementTunnel FreezingTunnel Ground FreezingTunnels
For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel (The Netherlands), the Artificial Ground Freezing technique was applied as temporary soil improvement. AGF by Brine and Liquid Nitrogen was implemented. Automatic data acquisition and recording systems were installed to monitor the variation of the temperatures in the soil during the freezing intervention in order to control the behaviour and the efficacy of the treatment. The LN process was managed through an automatic system controlling the LN flow versus temperature and the shut-down of the supply in case of safety hazards inside the shafts.
1