JAWRA Journal of the American Water Resources Association · 1984 · 20 citations · 12 references
Natural ResourcesHydrologyWater Resources ManagementHydrologic ForecastingHydrologic ModelingWater Resources EngineeringHydrologic AnalysisHydrologic Time Series AnalysisHydrological ModelingRiver EngineeringWater ManagementWater QualityDam Construction ImpactsDam Operation ImpactsHydrological Time Series AnalysisIntervention AnalysisRiverine TransportSeasonal Water Quality VariabilityWater Quality ForecastingWater Resource Forecasting
ABSTRACT The impoundment of the Kootenai River by Libby Dam caused changes in discharge and water quality in the river downstream from Lake Koocanusa. The changes observed downsteam were largely attributable to the depth of withdrawal from the reservoir and the reservoir's ability to store and mix various influent water masses. The preimpoundment and postimpoundment time series of discharge and six water quality variables were autocorrelated and exhibited strong seasonality. Intervention analysis, a technique employing Box‐Jenkins time series models, was used to quantify the nature and magnitude of the changes in water quality after the construction of Libby Dam. The models were developed with data from June 1967 through February 1981 and were able to satisfactorily forecast riverine conditions from March 1981 through January 1982.
12
Time Series Analysis: Forecasting and Control
Michael D. Geurts, George E. P. Box, Gwilym M. Jenkins · Journal of Marketing Research · 1977 · 19.3K citations
Computing, Data Science, Forecasting +11
Intervention analysis in water resources
Keith W. Hipel, William C. Lennox, T. E. Unny et al. · Water Resources Research · 1975 · 92 citations
Natural Resources, Hydrology, Water Resources Management +17