IEEE Transactions on Power Delivery · 2010 · 22 citations · 11 references
EngineeringElectrical EngineeringConstruction EngineeringPower ElectronicsTest ConstructionHigh-temperature MaterialsMagnetic ComponentsSuperconducting MaterialsEnduranceFull Load ConditionFull-load PerformanceHigh-temperature PerformanceHigh-temperature SuperconductorsMagnetic Circuit DesignSuperconducting TapesTransformer Design
An experimental high temperature superconducting transformer has been designed and built using Bi2223 HTS tape. The transformer is unique in that the magnetic circuit is comprised of air and a silicon steel partial core. Electrical tests were performed on the transformer and it was found to be 98.6% efficient at full load. The transformer failed during a full load endurance run and an investigation was carried out to determine the cause of the failure. The cause was believed to be from operating the HTS windings close to critical conditions. Presentation of the failure details will be of use to other researchers who are building HTS transformers.
11