American Journal of Clinical Pathology · 2009 · 95 citations · 13 references
ManagementOperations ManagementQuality ManagementLean ManufacturingLean OperationsProduction SystemsLean Healthcare OperationsLean Process ImprovementLean ProductionLean Quality ImprovementPlan-do-check-act CycleStandardized WorkLean Production PlanningPoint-of-care Testing WorkflowProcess GainsTertiary Care OrganizationToyota Production SystemUnit Production SystemVisual ControlsWork Cell Design
To meet the increased clinical demands of our hospital expansion, improve quality, and reduce costs, our tertiary care, pediatric core laboratory used the Toyota Production System lean processing to reorganize our 24-hour, 7 d/wk core laboratory. A 4-month, consultant-driven process removed waste, led to a physical reset of the space to match the work flow, and developed a work cell for our random access analyzers. In addition, visual controls, single piece flow, standard work, and "5S" were instituted. The new design met our goals as reflected by achieving and maintaining improved turnaround time (TAT; mean for creatinine reduced from 54 to 23 minutes) with increased testing volume (20%), monetary savings (4 full-time equivalents), decreased variability in TAT, and better space utilization (25% gain). The project had the unanticipated consequence of eliminating STAT testing because our in-laboratory TAT for routine testing was less than our prior STAT turnaround goal. The viability of this approach is demonstrated by sustained gains and further PDCA (Plan, Do, Check, Act) improvements during the 4 years after completion of the project.
13
Fixing health care from the inside, today.
Steven J. Spear · PubMed · 2005 · 323 citations
Health Professions, Health Administration, Health Care Management +17
The Henry Ford Production System
Richard J. Zarbo, J. Mark Tuthill, Rita D’Angelo et al. · American Journal of Clinical Pathology · 2009 · 72 citations