Computer-Aided Civil and Infrastructure Engineering · 1998 · 36 citations · 0 references
ArchitectureCivil EngineeringConstruction ManagementConstruction Operations ManagementConstruction Project ManagementSystems ModelingComputational ModelingConstruction AutomationSimulation ModelingSystem SimulationAtomic Model BuildingAtomic ModelsAutomated EarthmovingConstructionConstruction Equipment SimulationConstruction Process SimulationEarthmoving OperationsModel Simulation
Resource‑based modeling (RBM) is a general methodology for automating the modeling process of construction simulation. The paper develops an automated modeling system for simulating earthmoving operations, substantiating RBM concepts. RBM‑earth builds project‑specific simulation models by letting users select equipment and project details, automatically generating and assembling atomic models from an eight‑model library, equipment database, and linking structures, and then running the model in SLAMSYSTEM. RBM‑earth enables rapid creation of flexible, project‑specific simulation models without requiring simulation expertise, making simulation a practical tool for construction practitioners.
Resource‐based modeling (RBM) is a general methodology for automating the modeling process of construction simulation. This paper substantiates the RBM concepts and develops an automated modeling system for simulating earthmoving operations (RBM‐earth). Focusing on the properties involved in earthmoving operations, an atomic model library consisting of eight basic atomic models, an equipment database, miscellaneous linking structures, and the user interface have been developed in RBM‐earth. While using RBM‐earth to construct a simulation model, the user only needs to select required equipment and to specify project information for the operation. The information will be incorporated automatically into atomic models to generate project‐specific atomic models that are then assembled into a working model for the project. The model can be directly experimented by using SLAMSYSTEM. The biggest advantage of RBM‐earth is that a flexible project‐specific simulation model can be generated in a very little time without requiring the user to be proficient in simulation, as required by many current modeling systems. Therefore, simulation can be made an applicable tool for construction practitioners.