NCSU Libraries Repository (North Carolina State University Libraries) · 1998 · 44 citations · 3 references
EngineeringIndustrial EngineeringOperations ManagementProduction ControlProduction EngineeringProduction PlanningBottleneck AnalysisBottleneck ManagementManufacturing SimulationProduction SchedulingWork-in-process ControlFactory SimulationInventory-throughput RelationshipProcess BottlenecksProduction Bottleneck ModelingUnit Delay Modeling
In semiconductor fabrication facilities, an increase in work in progress (WIP)can be observed even weeks after the failure of the bottleneck workcenter. In this paper, we develop a simple fab model that facilitates the study of this phenomenon. The simplified factory consists of a detailed model of the bottleneck workcenter and a delay unit that represents the rest of the factory. After passing the delay unit the lots are fed back to the bottleneck to model the cyclic flow of lots of real wafer fabs. We study the behavior of this model for numerous scenarios, and it turns out that by means of the model the WIP increase phenomenon can successfully be reproduced. In addition, we provide first results on how to avoid the unwanted increase in inventory.
3
Measurable improvements in cycle-time-constrained capacity
John Fowler, S. Brown, Harvey J. Gold et al. · 2002 · 49 citations
Engineering, Industrial Engineering, Manufacturing Engineering +17