Marine Technology Society Journal · 2014 · 28 citations · 32 references
EngineeringMarine EngineeringOcean EngineeringDrillingOffshore StructuresProcess ControlControl SystemsControl TheoryController DesignModel Predictive ControlWell ControlWell ModelingAnnular Pressure ModelingBulk ModulusDisturbance AttenuationDisturbance Rejection ControlFriction FactorHeave DynamicsPid Control DesignPressure Control During Drilling
Abstract This paper presents a constrained finite horizon model predictive control (MPC) scheme for regulation of the annular pressure in a well during managed pressure drilling from a floating vessel subject to heave motion. In addition to the robustness of a controller, how to deal with heave disturbances despite uncertainties in the friction factor and bulk modulus is investigated. The stochastic model describing sea waves in the North Sea is used to simulate the heave disturbances. The results show that the closed-loop simulation without disturbance has a fast regulation response, without any overshoot, and is better than a proportional-integral-derivative controller. The constrained MPC for managed pressure drilling shows further improved disturbance rejection capabilities with measured or predicted heave disturbance. Monte Carlo simulations show that the constrained MPC has a good performance to regulate set point and attenuate the effect of heave disturbance in case of significant uncertainties in the well parameter values.
32
Constrained model predictive control: Stability and optimality
D.Q. Mayne, James B. Rawlings, Christopher V. Rao et al. · Automatica · 2000 · 8.5K citations
Model predictive control: Theory and practice—A survey
Carlos E. García, David M. Prett, Manfred Morari · Automatica · 1989 · 5.3K citations
Predictive control with constraints
Eduardo F. Camacho · Automatica · 2003 · 3.5K citations