Numerical Models Help Analyze Lost-Circulation/Flow Events and Frac Gradient Increase to Control an HPHT Well in the East Mediterranean Sea

Sanad Medhat, Carl Butler, Arshad Waheed, Bob Engelman, Ron Sweatman

2004 · 14 citations · 7 references

Concepts

Abstract

Abstract This paper presents the analysis methods and modeling results from a post-well study of a lost-circulation/flow event in a challenging high-pressure/high-temperature (HPHT) exploration well. The effects of well conditions such as wellbore pressure changes, rock mechanical properties, and geo-pressures are reported. Results from a new lost-circulation, finite element analysis (FEA) model also help explain why various formation-sealing treatment systems (some conventional and others new) failed to reduce the losses into the loss zones. After a new fracture gradient (FG) enhancement squeeze system (FGESS) was implemented, it effectively halted the losses. Full circulation was then re-established to stabilize the well. The well had been losing at an equivalent circulating density (ECD) of 16.4 lbm/gal. Application of the FGESS treatment increased the wellbore pressure containment integrity to sustain an equivalent of 17.0 lbm/gal mud as measured by a formation integrity test (FIT). This remarkable improvement in the apparent or near-wellbore FG (NWFG) or fracture re-initiation pressure (FRIP) was achieved along with several other cost-saving factors. A new FEA model is also discussed to help show how the FRIP or NWFG was increased by the FGESS treatment and may predict how FGESS treatments can increase the FRIP or NWFG in future wells. This fully 3-D model uses various types of treatment data and well conditions such as wireline log data for formation stresses and rock properties to calculate a FGESS treatment's higher FRIP or NWFG. Upon re-entry of the well 7 months after the successful FGESS treatment, the seal in the loss zones was still holding against HPHT conditions. This sustained seal reduced costs even more and allowed a liner to be set successfully without drilling fluid or cement losses in the reservoir section of the well. The conclusions of the study can help optimize well plans for future wells in the area, which can lead to lower costs for drilling fluids, casing design, cementing, and completion equipment.

References

7