New Solutions to Remedy Lost Circulation, Crossflows, and Underground Blowouts

R.E. Sweatman, C.W. Kessler, J.M. Hillier

Proceedings of SPE/IADC Drilling Conference · 1997 · 34 citations · 0 references

Concepts

Abstract

New Solutions to Remedy Lost Circulation, Crossflows, and Underground Blowouts R.E. Sweatman; R.E. Sweatman Halliburton Energy Services Search for other works by this author on: This Site Google Scholar C.W. Kessler; C.W. Kessler Halliburton Energy Services Search for other works by this author on: This Site Google Scholar J.M. Hillier J.M. Hillier Sonat Exploration Co. Search for other works by this author on: This Site Google Scholar Paper presented at the SPE/IADC Drilling Conference, Amsterdam, Netherlands, March 1997. Paper Number: SPE-37671-MS https://doi.org/10.2118/37671-MS Published: March 04 1997 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Sweatman, R.E., Kessler, C.W., and J.M. Hillier. "New Solutions to Remedy Lost Circulation, Crossflows, and Underground Blowouts." Paper presented at the SPE/IADC Drilling Conference, Amsterdam, Netherlands, March 1997. doi: https://doi.org/10.2118/37671-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE/IADC Drilling Conference and Exhibition Search Advanced Search AbstractCostly lost circulation, crossflows, and underground blowouts result in mud losses, wasted rig time, often ineffective remediation materials and techniques, and sometimes lost holes, sidetracks, abandoned wells, relief wells, and lost petroleum reserves. In early 1996, a service company initiated a project to review conventional remediation materials and methods, search for more effective remedies, and field-test new solutions. The project has led to the development of several novel lost-circulation material squeeze systems (LCMSS). These LCM squeeze systems were applied in wells after conventional materials/methods failed, and they successfully cured lost circulation, increased the ingerity and frac gradient (FMW) of weak zones (formations with low mechanical strength), sealed high-pressure water and gas zones, safely allowed deeper drilling, and stopped underground blowouts. Data from these field tests show encouraging trends and prospects not only to save costs associated with drilling trouble, but also to reduce normal exploration and production costs for casing, liners, drilling/completion fluids, rig time, poor primary cementation, remedial cementing, and water production.IntroductionAPI data1 in Table 1 indicates that lost circulation occurs in a significant percentage of wells. In some areas lost circulation occurs in 40 to 80% of wells. Several operators in such areas asked for new solutions to reduce or eliminate lost-circulation trouble, which can cost an additional several hundred thousand dollars to several million dollars per well. These unplanned costs were the result of wasted rig time, unsuccessful remedies, and many thousands of barrels of mud lost to various types of weak zones. Some operators needed to plug and seal these weak zones to stop crossflows that had led to underground blowouts (uncontrolled subsurface flow of oil, water, or gas). The preferred solution was to plug and seal the flow's exit point in the well (weak zone) and then either densify the drilling fluid to overbalance the flow influx point (high-pressure zone) or to plug and seal the flow influx zone. Other operators requested LCMSS for the following tasks:The treatment had to withstand certain EMW (Equivalent Mud Weight) squeeze pressures to allow an increased mud weight to overbalance deeper, higher pore-pressure zones when drilling resumed.The seal had to last for as much as several weeks of drilling until the next casing seat depth was reached.The plugging seal had to withstand both negative (swab) and positive (surge) pressures applied during drillpipe trips, casing runs, etc.The treatment needed to allow higher pump rate mud displacement and the accompanying higher equivalent circulating densities (ECDs).The treatment needed to eliminate the waiting periods after the maximum squeeze pressure was obtained to allow immediate washout of excess LCMSS in the hole and pressure testing for the improved formation integrity.The treatment had to eliminate an unplanned drilling liner. Keywords: annular pressure drilling, well control, casing and cementing, remedy, drilling operation, circulation, drilling fluids and materials, Upstream Oil & Gas, spe iadc 37671, drillpipe Subjects: Drilling Operations, Pressure Management, Drilling Fluids and Materials, Formation Evaluation & Management, Well control This content is only available via PDF. 1997. SPE/IADC Drilling Conference You can access this article if you purchase or spend a download.