Journal of Construction Engineering and Management · 2013 · 48 citations · 24 references
ManagementConstruction ManagementProject ManagementConstruction Project ManagementProject PlanningProject SchedulingConstruction PlanningConstruction SequencingRework ReductionTime-cost Tradeoff AnalysisActivitiesActivity OverlappingConstruction Activity SequencingCost Trade-offEarly CompletionMultipathPrecedence Network AnalysisProject Overlap Management
An effective and well-known technique for earlier completion of construction projects is to overlap the project activities that normally would be performed in sequence. Overlapping, often called fast-tracking, is inherently risky because it increases uncertainties and can result in more changes and rework. In order to gain maximum advantages from early project completion, a trade-off between benefits and losses of activity overlapping is required. In this paper, a new model has been developed to (1) explain in detail the mechanism and characteristics of design activity overlapping and (2) formulate and discuss design activity overlapping time-cost trade-off. A qualitative research methodology including interviews and focus groups with experts was used to generate and refine the model. This model contributes to the body of knowledge of construction management by demonstrating (1) how to analyze multipath networks through introducing the multi-predecessor effect and (2) how to analyze concurrent overlapping through introducing the cascade effect. The results of this paper can generate insights for further research to solve the overlapping time-cost trade-off and determine the optimum overlapping degree.
24
Practical Research: Planning and Design
Edward Brent, Paul D. Leedy · Teaching Sociology · 1990 · 9.4K citations
Management, Communication, Communication Research Methods +11
Applied Statistics and Probability for Engineers
Eric R. Ziegel · Technometrics · 2002 · 1.6K citations