New Equipment Designs Enable Swellable Technology in Cementless Completions

Hank Rogers, Dave Allison, Earl Webb

2008 · 14 citations · 2 references

Concepts

Abstract

Abstract In the oil and gas industry, it is a common practice to install production casing through producing formations, with cement providing the primary inter-zonal isolation in the annulus. However, inadequate displacement efficiencies, fluid contamination, and loss circulation intervals sometimes limit the ability of a cementing operation to provide zonal isolation sufficient to prevent annular communication over the life of the well. Formation damage caused by cementing operations can also adversely affect life-of-the-well production capabilities, thereby adversely affecting the economics of the well. New completion technologies using swellable elastomers can offer an alternative to cementing operations performed over producing formations. However, conventional floating equipment has limited the application of swellable elastomers in some completion operations. For example, in noncemented completions where swellable elastomers provide the only annular barrier, a mechanical seal having a service life equal to the life of the well under downhole conditions is required at the toe of the production casing. This paper describes the benefits of swellable elastomers used to provide life-of-the-well zonal isolation. Additionally, the paper recounts a problem job in which improperly selected check valves were used and new check valves specifically designed for noncemented completions were successfully introduced. Lastly, this paper provides details about equipment designed for a south Texas well that will incorporate SEPs, float equipment, and a combination wiper plug designed specifically for a noncemented completion to be performed in late 2007 or early 2008.

References

2