IEEE Transactions on Robotics and Automation · 2001 · 104 citations · 24 references
EngineeringIndustrial EngineeringManufacturing EngineeringManufacturing SystemsProduction PlanningSchedulingAssembly SystemsFlexible Manufacturing SchedulingManufacturing Resource PlanningManufacturing System IntegrationManufacturing Systems ArchitecturePetri NetsDemanufacturingDisassemblyDisassembly PlanningDisassembly Process PlanningDisassembly Sequence PlanningEnvironmental PressuresPetri Net ModelsProduct Disassembly Planning
Industrial demanufacturing is a practice of growing importance due to increasing environmental and economic pressures. However, very little research focuses on it from a system perspective. This paper presents a disassembly planning and demanufacturing scheduling method for an integrated flexible demanufacturing system. Workstation Petri net and Product Petri net are proposed for its hierarchical and modular modeling in order to derive the disassembly path with the maximal end-of-life value. Scheduling Petri net is introduced to schedule the demanufacturing resources. The proposed methodology and algorithms are demonstrated through the disassembly of personal computers in an integrated flexible demanufacturing system.
24
Discrete-Event System Simulation
Jerry Banks, John S. Carson · Technometrics · 1984 · 2.7K citations
Strategic Issues in Product Recovery Management
Martijn Thierry, Marc Salomon, Jo van Nunen et al. · California Management Review · 1995 · 1.4K citations · Full text
AND/OR Graph Representation of Assembly Plans
Luiz S. Homem de Mello · 1986 · 683 citations