2002 · 23 citations · 3 references
EngineeringElectrical EngineeringManufacturing EngineeringMicroelectronicsMicrowave EngineeringSemiconductor DevicesManufacturing SimulationSemiconductor PolicyCycle TimeDiscrete-event ModelingDiscrete-event SystemsManufacturingManufacturing Cycle TimeManufacturing Performance MeasurementSimulation-based Release SchedulingWafer-level Release Processes
The workload regulating wafer release policy, that was developed for MWTD's (Hewlett-Packard's Microwave Technology Division) GaAs fabrication facility is described. A discrete-event simulator, ManSim was used to determine its improvements over other wafer release policies, and it was shown that it has the potential to reduce fabrication cycle time by roughly 50%. It is suggested that the plant's historical focus on leading-edge process technology rather than on more traditional measures of manufacturing performance has delayed the recognition of the potential of a policy of this type.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
3