IEEE Transactions on Semiconductor Manufacturing · 2023 · 10 citations · 33 references
ManagementIndustrial EngineeringManufacturing EngineeringOptimizationProduction PlanningSchedulingConstrained OptimizationConstraint ProgrammingConstraint-based SchedulingInteger ProgrammingMachine SchedulingResource-constrained SchedulingMixed-integer ProgrammingMixed-integer Programming For SchedulingPhotolithographyScheduling ProblemsScheduling With Sequence-dependent Setup TimesSequence-dependent Setup TimesSetup TimesUnrelated Parallel Machine Scheduling
This paper studies the problem of scheduling machines in the photolithography area of a semiconductor manufacturing facility. The scheduling problem is characterized as an unrelated parallel machine scheduling problem with machine eligibilities, sequence- and machine-dependent setup times, auxiliary resources and transfer times for the auxiliary resources. Each job requires two auxiliary resources: a reticle and a pod. Reticles are handled in pods and a pod contains multiple reticles. Both reticles and pods are used on multiple machines and a transfer time is required if transferred from one machine to another. A novel constraint programming (CP) approach is proposed and is benchmarked against a mixed-integer programming (MIP) method. The results of the study, consisting of a real-world case study at a global semiconductor manufacturer, demonstrate that the CP approach significantly outperforms the MIP method and produces high-quality solutions for multiple real-world instances, although optimality cannot be guaranteed.
33
IBM ILOG CP optimizer for scheduling
Philippe Laborie, Jérôme Rogerie, Paul Shaw et al. · Constraints · 2018 · 293 citations