2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165) · 2002 · 15 citations · 3 references
EngineeringIndustrial EngineeringOperations ManagementAutomationManufacturing SystemsProduction PlanningIndustrial AutomationManufacturing AutomationManufacturing Cost AnalysisManufacturing SimulationManufacturing TechnologyMaterial HandlingAutomated Material HandlingCost Estimation MethodologyCost SimulationManufacturing Cost ModelingMaterial Handling AutomationOperational Cost AnalysisProduction Cost AnalysisProduction Lot Sizing
In the next generation of semiconductor wafer fabrication facilities, decisions concerning material handling systems will be a major factor in initial facility cost, operational cost, production cycle times and possibly product yield percentages. The wafers will increase in diameter to 300 mm and a new front opening unified pod (FOUP) has been designed to carry them, both increasing the weight of a production lot. This increase requires substantial automation for ergonomic and quality reasons. As a result, semiconductor manufacturers are asking, "what level of automation is financially justifiable?" Automation suppliers have stated that automation saves money, but have as yet not produced a sufficiently detailed financial analysis proving their premise. In this paper, both a fully automated and a manual material handling system are simulated and compared in a thorough cost analysis. Sensitivity analysis is performed on inflation rate, interest rate, die price, wafer start rate, and yield percentage to validate the results of the analyses.
3
E. Cardarelli, Pacifico M. Pelagagge · IEEE Transactions on Semiconductor Manufacturing · 1995 · 66 citations
Measurable improvements in cycle-time-constrained capacity
John Fowler, S. Brown, Harvey J. Gold et al. · 2002 · 49 citations
Engineering, Industrial Engineering, Manufacturing Engineering +17