2006 · 12 citations · 4 references
ManagementIndustrial EngineeringProject ManagementProject PlanningProject SchedulingSchedulingJob SequencingSchedule OptimizationStochastic SchedulingWork SchedulesWork SchedulingActivity DurationsActivity SequencingIdle Time ReductionProbabilistic Project SchedulingProbabilistic SchedulingProject Duration MinimizationProject Duration ReductionRepetitive Scheduling
The sequence step algorithm addresses for the first time the problem of scheduling repetitive projects with probabilistic activity durations while maintaining continuous resource utilization. This algorithm is based on generalized concepts that can be implemented in most general-purpose simulation systems. The algorithm is presented in detail and is applied to an example project with 7 activities and 4 repetitive units using a simulation model developed in stroboscope, an activity-based simulation system. Numerical and graphical results help explain the algorithm and provide insight into the underlying tradeoff problem between reducing the expected crew idle time and increasing the expected project duration
4