IEEE Power Engineering Review · 2001 · 141 citations · 4 references
EngineeringElectrical EngineeringSystems EngineeringEnergy EconomicsEnergy SystemsRenewable Energy SystemsElectricity MarketsPower Grid AnalysisPower System DesignPower SystemsPower Transmission SystemsTransmission PlanningElectric Transmission PlanningNetwork ExpansionNetwork PowerOptimal Location ModelingProduction Cost AnalysisTransmission Grid ExpansionTransmission Network Expansion PlanningTransmission System Expansion
Power system restructuring requires expanding unused potentials of transmission systems due to environmental, right-of-way and cost problems, which are major hurdles for power transmission network expansion. FACTS devices can be an alternative to reduce the flows in heavily loaded lines, resulting in an increased loadability, low system loss, improved stability of the network, reduced cost of production, and fulfilled contractual requirements by controlling the power flows in the network. This letter suggests first, the few optimal locations of FACTS devices and then determines the best optimal location in order to reduce the production cost along with the device cost. The allocation and requirement are also discussed. The effectiveness of the proposed methods is demonstrated on an IEEE 14-bus system.
4
Optimal dispatch under transmission contracts
Risheng Fang · IEEE Transactions on Power Systems · 1999 · 136 citations
Business, Economics, Contract Theory +15
Congestion management by optimising FACTS device location
S. N. Singh · 2002 · 85 citations
Engineering, Electrical Engineering, Systems Engineering +13