EngineeringNuclear EngineeringNuclear ControlProcess ControlProcess Systems EngineeringControl SystemsControl TheoryController DesignController TuningNonlinear Process ControlPower Plant Control SystemsCascade Feedforward ControlGain SchedulingInternal Model Control TuningNonlinearityPid TuningSteam Generator ControlTuning RulesWater Level Control
In this paper, a gain-scheduled equivalent-cascade internal-model-control (IMC) tuning method for water level control system of nuclear steam generator is presented. First, a water level control system for a steam generator is transferred into an equivalent cascade-feedforward control system. Second, analytical tuning rules for the equivalent cascade control system are derived based on the IMC-(proportional-integral-derivative) PID method, which can simultaneously tune the primary/secondary loops and avoid the re-identification step. Finally, gain scheduling is performed to eliminate the influence of process nonlinearity. The experimental results of nuclear simulation platform have demonstrated the superiority of the proposed tuning method.
21
Wilson J. Rugh, Jeff S. Shamma · Automatica · 2000 · 1.8K citations
Westinghouse AP1000 advanced passive plant
Terry L. Schulz · Nuclear Engineering and Design · 2006 · 602 citations