A BP Neural Network-Based Hierarchical Investment Risk Evaluation Method Considering the Uncertainty and Coupling for the Power Grid

Shujuan Chen, Qin Jiang, Yuqing He, Ruanming Huang, Jiayong Li, Can Li, Jing Liao

IEEE Access · 2020 · 15 citations · 22 references

DOIFull text

Open access

Concepts

TL;DR

Investment decisions in power grids are hampered by uncertain, highly coupled risks, and inaccurate risk evaluation can cause significant economic losses for power companies. This study proposes a hierarchical risk evaluation method that incorporates uncertainty and risk coupling to improve evaluation accuracy and reduce economic losses. The method first uses a BP neural network to model individual risk uncertainty and time‑response from historical data, producing interval‑probability loss distributions, then aggregates these risks at an upper level by discretizing inputs into probability sequences and applying sequence‑operation theory to account for risk coupling. The hierarchical approach provides accurate risk assessments that inform risk management and investment decisions, and extensive case studies confirm its effectiveness.

Abstract

Investment decision-making is affected by the uncertain and highly coupled risks in the power grid, and the inaccurate risk evaluation results in the great economic losses of power companies. In order to improve the accuracy of risk evaluation and reduce the economic losses, a hierarchical risk evaluation method considering the uncertainty and coupling of risks is proposed in this paper. At the lower level, the uncertainty and time response of risks are taken into consideration for evaluating individual risks accurately in the power grid. Through the data processing of historical risk factors based on BP neural network, the distribution regularities of risk loss and probability of occurrence are performed. According to the partition of time period, risk losses expressed by the interval and corresponding probabilities in different time periods are identified. The evaluation results at the lower level are considered as the basis for risk management and the inputs at the upper level. At the upper level, a comprehensive evaluation of multiple risks is performed for evaluating the investment scheme accurately. A discretization method is developed to transform the inputs into the probability sequences, and the sequence operation theory is applied in the comprehensive evaluation of multiple risks that considers the coupling among risks. Extensive case studies are presented to validate the effectiveness of the proposed method for risk evaluation.

References

22