Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · 2020 · 21 citations · 25 references
ArchitectureConstruction ManagementProject Management3D ModelingConstruction EngineeringConstruction Project ManagementConstruction PlanningProject Delivery MethodsProject Delivery SystemsAdvanced PackagingConstructionConstruction Work PackagingWork Package Planning
Project failures and disputes are not uncommon in the construction industry. Advanced work packaging (AWP) is a planning and execution approach popular for capital and industrial projects. Although management processes are well defined, a gap still exists between informational deliverables provided by engineering and construction planners’ needs. Such disconnect is predominant in piping three-dimensional (3D) models for industrial projects, which often require adjustments and rekey of information in later stages of the project to be suitable for construction. This rework commonly causes delays and cost overruns in the project—a scenario prone to result in claims and disputes. To better understand this gap, the Construction Industry Institute (CII) commissioned Research Team TC-01 to investigate major hurdles experienced with piping 3D models, and to provide guidelines for a more construction-ready deliverable. Experienced construction professionals were interviewed and results indicate a lack of uniformity in 3D model development, lack of perception of the 3D model as a tool to be used downstream in the project, and lack of perception of the 3D model as a formal deliverable.
25
How Many Interviews Are Enough?
Greg Guest, Arwen Bunce, Laura Johnson · Field Methods · 2005 · 19.4K citations
Handbook of Qualitative Research
Journal of Environmental Psychology · 1994 · 5.8K citations
A guide to the project management body of knowledge (PMBOK guide)
Pmbok · 2004 · 4.3K citations