Flood disturbance, recovery, and inter-flood incision on a large sand-bed river

Stanford Gibson, John Shelley

Geomorphology · 2019 · 18 citations · 43 references

DOIFull text

Open access

Concepts

Abstract

The lower 800 km of the Missouri River has been incising for decades. However, the 2011 flood scoured more sediment than the previous 12 yr combined. The river rebounded in the following two years, re-depositing over 70% of the sediment scoured during the 2011 flood. Historic evidence suggests that past Missouri River floods may have followed similar scour-rebound patterns. This paper analyzes 16 channel surveys from 1987 to 2014, including 50,723 total cross sections to document the morphological history of the lower 800 km of the Missouri River over the last thirty years, including flood disturbance and long-term trends. The last thirty years on the Missouri River included two basic morphologic regimes: steady incision during low-to-moderate flow periods and rapid scour-rebound responses to floods. Surveys collected during the 2011 flood demonstrate that the river scoured throughout the flood (including the falling limb) and did not begin a rebound phase until after the flood. The analysis also identifies sediment sinks associated with each of these scour regimes (flood scour and incision between floods) that exceed the total volume eroded from the bed during those periods. Results suggest that floodplain deposition may induce the supply limitation that drives flood scour on this large sand-bed river. Additionally, aggregate mining removes substantially more sediment than the total river incision between floods and the reaches with maximum scour during the 1993 and 2011 floods correspond to the zones of aggregate mining.

References

43