Electro-dewatering pretreatment of sludge to improve the bio-drying process

Sha Li, Xiaoyan Yu, Xingxin Liu, Xiaotong Yan, Jingxiao Duan, Yingte Li, Shuting Zhang

RSC Advances · 2019 · 18 citations · 43 references

DOIFull text

Open access

Concepts

Abstract

was 8.7% higher than that of raw sludge. EDW pretreatment accelerated the drying rate of bio-drying process, and the final water content of sludge (44%) was 6.3% lower than that of non-pretreated sludge. It was observed that in the bio-drying process with an EDW pretreatment, the first peak temperature of the sludge pile was 58.7 °C at 36 h and the second peak temperature was 48.7 °C at 56 h, whereas that of the non-pretreated sludge was only 46.5 °C at 42 h and 40.3 °C at 62 h, respectively. The EDW sludge incorporating straw as a bulking agent showed promising results during bio-drying. In addition, EDW pretreatment of sludge to improve the bio-drying process showed lower energy consumption and cost.

References

43