Minerals · 2019 · 58 citations · 28 references
EngineeringGeological EngineeringMining EngineeringMine PlanningProduction PlanningSchedulingBlock ModelingGeological Block ModelingMine SchedulingMine SequencingPit OptimizationResource EstimationGeological Uncertainty ModelingMine Planning OptimizationMine Scheduling OptimizationMineral Deposit ModelingStochastic Integer ProgrammingStochastic Mine PlanningStochastic Mine SchedulingUltimate Pit Limit
Long‑term open‑pit mine planning relies on deterministic resource models that assume average geometallurgical variables, exposing projects to risk from spatial variability and uncertainty. This study develops a long‑term open‑pit planning framework that integrates equiprobable geometallurgical scenarios and stochastic integer programming for risk‑aware block scheduling. The approach first optimizes pit limits per scenario, then selects a reliability‑based ultimate pit, followed by stochastic life‑of‑mine scheduling that maximizes expected discounted value while minimizing production‑cost deviations, with strategies tailored to economic models and processing constraints. Results demonstrate that incorporating geometallurgical uncertainty alters pit limits and production schedules, thereby significantly affecting financial performance.
Long-term open-pit mine planning is a critical stage of a mining project that seeks to establish the best strategy for extracting mineral resources, based on the assumption of several economic, geological and operational parameters. Conventionally, during this process it is common to use deterministic resource models to estimate in situ ore grades and to assume average values for geometallurgical variables. These assumptions cause risks that may negatively impact on the planned production and finally on the project value. This paper addresses the long-term planning of an open-pit mine considering (i) the incorporation of geometallurgical models given by equiprobable scenarios that allow for the assessing of the spatial variability and the uncertainty of the mineral deposit, and (ii) the use of stochastic integer programming model for risk analysis in direct block scheduling, considering the scenarios simultaneously. The methodology comprises two stages: pit optimization to generate initial ultimate pit limit per scenario and then to define a single ultimate pit based on reliability, and stochastic life-of-mine production scheduling to define block extraction sequences within the reliability ultimate pit to maximize the expected discounted value and minimize the total cost of production objective deviations. To evaluate the effect of the geometallurgical information, both stages consider different optimization strategies that depend on the economic model to be used and the type of processing constraints established in the scheduling. The results show that geometallurgical data with their associated uncertainties can change the decisions regarding pit limits and production schedule and, consequently, to impact the financial outcomes.
28
Optimum Design of Open-Pit Mines
H. Lerchs · Medical Entomology and Zoology · 1965 · 396 citations