2018 · 10 citations · 9 references
ManagementIndustrial EngineeringOperations ManagementLogistics ManagementOptimizationSchedulingCargo Handling SystemsInteger ProgrammingPort OperationsPort Operations ManagementSchedule OptimizationVehicle SchedulingCranesDynamic Programming PrinciplesMixed-integer OptimizationMixed-integer ProgrammingPort Resource AllocationQuay Crane PlanningQuay Crane SchedulingVessel Scheduling
This paper discusses the Quay Crane Scheduling Problem (QCSP) at port of Tripoli-Lebanon, determines the unloading/loading sequences of bays for quay cranes assigned to a single container vessel, provides a mixed integer programming model for the quay crane scheduling problem and proposes a dynamic programming algorithm to solve the QCSP. The objective of this paper is to minimize the completion time of unloading/loading containers and therefore to reduce the docking time of the vessel in the terminal. Finally the results of this paper are compared to the port results.
9