Complexity · 2018 · 11 citations · 27 references
EngineeringIndustrial EngineeringSupply Chain ManagementOptimizationProduction EngineeringSchedulingCombinatorial OptimizationInteger ProgrammingMulti-objective SchedulingProduction OptimizationProduction SchedulingSupply Chain OptimizationInteger Nonlinear ProgrammingIntegrated Production SystemsProduction System ModelingProduction System OptimizationShipment Scheduling
This paper discusses the integrated scheduling of production and distribution operations in a multifactory supply chain with make‐to‐order production system. For the production side of the supply chain, we considered distributed parallel‐established factories with identical parallel machines available at each factory. We assumed that the factories could produce all customers’ orders with different production rates and costs. For the distribution side of the supply chain, we considered a limited number of homogeneous vehicles that immediately distribute the finalized orders to the customers. Then, a mixed‐integer nonlinear programming model is developed to determine the detailed scheduling of production and distribution that minimizes the total costs of the supply chain including production, distribution, and late delivery costs. To solve the real‐world scale problems, we developed a new whale optimization algorithm (WOA). Moreover, we conducted computational experiments by generating several test problems to evaluate the proposed algorithm. Statistical analysis showed that the proposed algorithm has better performance than traditional WOA for different scales of the problem. Moreover, it confirms the capability of the improved whale optimization algorithm (IWOA) to solve the medium‐scale instances; however, the results indicate the better performance of genetic algorithm (GA) for the large‐scale instances.
27
The Whale Optimization Algorithm
Seyedali Mirjalili, Andrew Lewis · Advances in Engineering Software · 2016 · 14K citations
P-Complete Approximation Problems
Sartaj Sahni, Teofilo F. Gonzalez · Journal of the ACM · 1976 · 1.7K citations · Full text
Scheduling independent tasks to reduce mean finishing time
John Bruno, E. G. Coffman, Ravi Sethi · Communications of the ACM · 1974 · 500 citations · Full text