Plug & abandonment of offshore wells: Ensuring long-term well integrity and cost-efficiency

Torbjørn Vrålstad, Arild Saasen, Erling Fjær, Thomas Monge Øia, Jan David Ytrehus, Mahmoud Khalifeh

Journal of Petroleum Science and Engineering · 2018 · 295 citations · 80 references

DOIFull text

Open access

Concepts

TL;DR

The offshore P&A wave in mature basins demands permanent barriers across the well cross‑section to prevent leaks, but installing barriers in all annuli is time‑consuming and costly. This review examines cost‑effective technologies for offshore well P&A that achieve permanent barriers. The paper surveys cement and alternative plugging materials, leak‑path failure mechanisms, shale‑based barriers, and subsea‑specific P&A considerations. The study finds that installing barriers in every annulus is labor‑intensive and expensive.

Abstract

There is an upcoming "P&A wave" of wells that need to be permanently plugged and abandoned, especially in mature, offshore areas such as the North Sea and Gulf of Mexico. It is important to ensure that plugged wells do not leak after abandonment, as there could be several potential leak paths such as microannuli in plugged wells. To ensure well integrity after abandonment, permanent well barriers must extend across the full cross section of the well. That includes establishing barriers in all annuli, which could however be quite time-consuming and thus costly. This paper is a review of challenges and technologies for P&A of offshore wells, with an emphasis on cost-effective solutions while establishing permanent well barriers. An overview of cement and other plugging materials is given, as well as a discussion of different types of potential leak paths and failure mechanisms in permanently plugged and abandoned wells. Moreover, recent technology developments such as utilizing shale as barrier for P&A are described. A discussion on the special considerations related to P&A of subsea wells is also included.

References

80