Journal of Water Resources Planning and Management · 2018 · 22 citations · 46 references
EngineeringCivil EngineeringWater Resources ManagementDecision AnalysisWater Resources EngineeringWater Resources PlanningWater Distribution SystemsWater Resource Management DecisionsWater Risk ManagementWater Supply EngineeringWater Supply OperationsWater Supply System AnalysisFailure Data AnalysisFuzzy TopsisNetwork RehabilitationOptimization Of Distribution NetworksPipeline RehabilitationTopsisWater Distribution Network AnalysisWater Distribution System Design
In this research, a hybrid risk-based decision-making (HRDM) method is proposed, in which by using pipe design parameters (PDPs), it is possible to determine a rehabilitation road map for water distribution networks (WDNs) in the future. This method can be useful for networks that have imprecise operational-failure data when planning rehabilitation. In this regard, based on PDPs, the water supply failure risks (WSFR) of pipes in the network are assessed; subsequently, the pipes are prioritized based on their rehabilitation potential indices (RPI), which are calculated using a decision-making model (DMM) called Fuzzy TOPSIS (technique for order preferences by similarity to an ideal solution). This method is used to plan the water network rehabilitation needs for Qods Town of Qom Province in Iran. The results indicate that, in the absence of accurate operational-failure data, a road map of future rehabilitation of water networks can be determined by using PDPs. Furthermore, the network zones and their pipes can be prioritized according to their rehabilitation needs. It was also found that pressure, flow velocity, flow rate, and pipe diameter are more reliable PDPs for rehabilitation planning.
46