Mathematical Problems in Engineering · 2018 · 10 citations · 36 references
Logistics ProcessesSupply Chain OptimizationEngineeringLogistics OptimizationIndustrial EngineeringSmart ManufacturingInventory TheoryProduction ManagementOperations ResearchMaintenance TimeTransportation CostSystems EngineeringLogisticsSupply ChainLogistics ModelManufacturing PlanningManufacturing SystemsSupply Chain DesignSupply Chain ManagementOvertime WorkOperations ManagementProduction PlanningLimited Production CapacityBusinessProduction Engineering
An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated. We introduce the factor of overtime work into the model to improve the manufacturer’s production. In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously. By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy. We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.
36
Coordinated supply chain management
Douglas J. Thomas, Paul M. Griffin · European Journal of Operational Research · 1996 · 1.3K citations