Instruments and Experimental Techniques · 2017 · 10 citations · 6 references
EngineeringElectrical EngineeringElectromagneticsArc WeldingCurrent-voltage CharacteristicsElectric CircuitsErosionArc DischargesArc ErosionBreaker Zone DynamicsElectrical Arc DetectionElectrode ErosionErosion MechanismsHigh-voltage Breakdown
An experimental test setup for investigating arc and erosion processes in gas-filled high-voltage high-current switches is described and some results that were obtained on it are presented. The setup includes a discharge chamber that allows simulation of the process of disconnecting the ring and pin contacts, a capacitive energy storage with a capacitance of 0.11 F and a charging voltage of up to 10 kV, and a remotely controlled gas-supply system. The diagnostic complex includes systems for measuring the discharge current, the voltage across the arc, and the pulse pressure in the chamber, as well as high-speed filming and optical spectroscopy. Experiments with a current amplitude of 30–300 kA can be performed on the test bench. During the first current half-period of 1.0–3.0 ms, the contacts move apart to a distance of 3–4 cm. The arc is cooled via transverse gas blowing at a pressure in the chamber of 0.5–1.5 MPa. A movable contact is displaced due to the pressure of the gas that is pumped into the chamber.
6
Electrode erosion in high current, high energy transient arcs
A. Donaldson, M. Kristiansen, Alan Watson et al. · IEEE Transactions on Magnetics · 1986 · 98 citations · Full text
Investigation on the Arc Phenomenon of Air DC Circuit Breaker
Hao Sun, Mingzhe Rong, Zhexin Chen et al. · IEEE Transactions on Plasma Science · 2014 · 22 citations