International Journal of Production Research · 2017 · 20 citations · 52 references
ManagementIndustrial EngineeringOperations ManagementParallel ComputingProduction PlanningSchedulingDynamic SchedulingJob SequencingMachine SchedulingScheduling TheoryStochastic SchedulingCustomer Order HandlingCustomer Order ProcessingCycle TimeOrder SequencingProper PoliciesScheduling With Sequence-dependent Setup TimesSetup TimesUnrelated Parallel Machine Scheduling
Short cycle time of customer orders is crucial for companies to achieve mass customization and quick response. However, the complicated and stochastic environment, especially the exist of setup times, makes it extremely challenging to optimize the efficiency of a system. In this study, stochastic customer orders are scheduled to minimize their expect cycle time with the consideration of setup times. Customer orders arrive dynamically, and each order requires multiple product types with random workloads. These workloads will be assigned to a set of unrelated parallel machines to be processed. Particularly, for each machine, setup times are required whenever there is a product type changeover, and the lengthes are both machine- and product type-dependent. This paper intends to minimize the long-run expected order cycle time by proper policies including workload allocation and type sequencing. The impacts of product type sequence and workload variance are evaluated through theoretical study and several analytical properties are developed. With the help of these properties, three scheduling algorithms are proposed, and a lower bound is derived to evaluate the proposed algorithms. Computational experiment is conducted to demonstrate the effectiveness of the lower bound and the algorithms under various circumstances, and several important managerial insights are also provided.
52
J. Scott Armstrong, David M. Georgoff · International Journal of Forecasting · 1988 · 18.2K citations
A new polynomial-time algorithm for linear programming
Narendra Karmarkar · COMBINATORICA · 1984 · 4.8K citations
Approximation Algorithms for NP-Hard Problems
Dorit S. Hochba · ACM SIGACT News · 1997 · 3.1K citations · Full text
A survey of scheduling problems with setup times or costs
Ali Allahverdi, C.T. Ng, T.C.E. Cheng et al. · European Journal of Operational Research · 2006 · 1.3K citations · Full text
Management, Industrial Engineering, Operations Management +12
European Journal of Operational Research · 1989 · 1.3K citations