Journal of Management in Engineering · 2017 · 52 citations · 45 references
ManagementConstruction ManagementProject ManagementConstruction FinanceProject FinanceRisk AnalysisConstruction RiskFinancial RiskProject RankingProject RiskBuild Operate Transfer RiskCase Study EvaluationFinancial Model ConstructionProject Evaluation CriteriaProject Ranking CriteriaProject Risk Prioritization
The financial resources required to invest in high-budget infrastructural projects increase the interest in build-operate-transfer (BOT) models. Megatransportation projects, in which BOT is commonly used as a financial model, are seen as potentially important because of the considerable impact they have on the construction industry. Therefore, it is crucial to determine and manage the financial risks in these projects. In this context, the aim of this paper is to investigate the role of financial risks based on the criteria of success in BOT megatransportation projects from the point of the concessionaire. Therefore, financial risks were determined and then ranked by using the technique for order preferences by similarity to ideal solutions (TOPSIS) method. Then, the validity of determined financial risks was tested in an ongoing BOT mega-airport project by using the case study method. The prominent risk factors were the finance issues related to design changes and occupational safety and health, bankruptcy/insolvency of one of the private partners, currency risk, and fluctuation of the inflation rate.
45
Case study research: design and methods
Simon Phelan · Evaluation & Research in Education · 2011 · 21.9K citations
A guide to the project management body of knowledge (PMBOK guide)
Pmbok · 2004 · 4.3K citations