Grouted pile to sleeves connections: Design provisions for the new ISO Standard for offshore structures

R.G. Harwood, C.J. Billington, Jaime Buitrago, A.B. Sele, John V. Sharp

OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1996 · 13 citations · 0 references

Concepts

Abstract

A Technical Core Group (TCG) was set up in March 1994 to review the design practice provisions for grouted pile to sleeve connections, mechanical connections and repairs as part of the international harmonization process for the new ISO Standard, ISO 13819-2, Petroleum and Natural Gas Industries--Offshore Structures, Part 2: Fixed Steel Structures. This paper provides an overview of the development of the proposed new design provisions for grouted connections including, the gathering and screening of the data, the evolution of the design formulae, and the evaluation of the resistance factor. Detailed comparisons of the new formulae with current design practice (API, HSE and DnV) are also included. In the development of the new provisions the TCG has been given access to the largest database ever assembled on this topic. This database includes all the major testing programs performed over the last 20 years, and recent UK and Norwegian research projects not previously reported. The limitations in the database are discussed and the areas where future research would be of benefit are highlighted.